Sol 1312: The best laid plans…

The original plan for today included an ~11 m drive to get closure to a fracture in the Stimson formation.  However, during science discussion, the team talked further about how to best sample both altered and unaltered Stimson bedrock, and realized that some of the best places to accomplish the proposed sampling were likely behind us!  As a result of this discussion, the drive in today’s plan was pulled at … Continue reading Sol 1312: The best laid plans…