30 May 2010

Attabad overtopping – first image

Posted by Dave Petley

The Daily Times has published the first picture of the spillway in operation:

Meanwhile, the Pamir Times reports that: “The volume of water passing through the spillway has reportedly increased to around 50 Cusecs”.  50 Cusecs is 1.4 cubic metres per second.  This is still a fraction of the total inflow, so we have a long way to go.